Until now, the government’s solar discount only worked for systems up to 100 kilowatts (kW). If your business needed a bigger system, you missed out on the upfront rebate.
That changed on 1 October 2026. The limit is now 1 megawatt (MW), which is 10 times bigger. So more businesses can now get money off the cost of their solar.
If you own or run a warehouse, factory, farm, cold store, school or shop, this could save you a lot. But there are some new rules and paperwork to know about first.
This guide explains the change in plain words. It’s for anyone thinking about commercial solar systems who wants clear facts. Each key point links to an official source, so you can check it yourself.
Here’s the quick version. Solar systems over 100 kW and up to 1 MW can now earn a rebate called STCs, if they’re installed on or after 1 October 2026. The Clean Energy Regulator (CER) confirms the rules have changed. The government says this could cut the upfront cost by around 20%. Your own savings will depend on your site, your location and the price of the certificates.
Key Takeaways
Solar rebates up to 1MW now apply to eligible systems installed from 1 October 2026
Eligibility depends on the installation date, not when you started planning or building
Mid-scale systems get a fixed five-year deeming period through to 2030
You'll need extra paperwork, including an engineer's report and a network connection agreement
Expansions only earn STCs on the new capacity
The CER says claims open in mid to late November 2026
What Changed on 1 October 2026?
On 5 August 2026, Climate Change and Energy Minister Chris Bowen announced the expansion. The regulations followed. They're called the Renewable Energy (Electricity) Amendment (Mid-scale Solar) Regulations 2026, and GreenDeal's summary explains they took effect on 1 October.
Here's the simple version of how commercial solar rebates are now split:
System size | Scheme | How the incentive works |
Up to 100 kW | Small-scale (SRES) | Upfront STCs. The deeming period steps down each year (5 years in 2026, 4 in 2027, and so on) |
Above 100 kW, up to 1 MW | Mid-scale (SRES), new | Upfront STCs with a fixed five-year deeming period through to 2030 |
Above 1 MW | Large-scale (LRET) | Large-scale generation certificates (LGCs), earned over time |
The step-down for small systems is explained in Formbay's guide. The Department of Climate Change, Energy, the Environment and Water confirms that existing mid-scale systems already in the large-scale scheme stay there, and new systems above 1 MW remain in the large-scale scheme.
How Do Commercial Solar STCs Work?
An STC is a certificate that stands for one megawatt-hour of expected clean energy. When your system is installed, it creates a number of certificates up front, based on a simple formula:
STCs = system size (kW) × zone rating × deeming period (years)
The zone rating depends on your postcode, because some parts of Australia get more sun than others. The CER publishes the postcode zone ratings. For example, Zone 3, which covers Sydney, Brisbane, Perth and Adelaide, has a rating of 1.382, and Zone 4, which covers Melbourne, is 1.185, according to this summary of the scheme.
The deeming period is the number of years of expected output you're paid for in advance. For mid-scale systems, the CER's transitional guidance says it's a fixed five years through to 2030.
Certificates are sold, usually through your installer or an agent, who then takes the value off your invoice. The CER's Clearing House sets a fixed price of $40 per certificate (excluding GST), and market prices have been sitting around $37 to $40.
How Much Could Solar Rebates for Businesses Be Worth?
Let's run the numbers. These are examples only. Your real figure depends on your postcode, your install date and the certificate price on the day.
250 kW in Zone 3: 250 × 1.382 × 5 = about 1,727 STCs, worth roughly $68,000 at about $39.40 each
500 kW in Zone 3: about 3,455 STCs, or around $136,000
250 kW in Zone 4 (Melbourne): 250 × 1.185 × 5 = about 1,481 STCs, or around $58,000
Government examples reported by Haron Robson put a 250 kW system at about $68,000 and an 850 kW system at about $230,000. That lines up with our maths.
Industry providers often quote paybacks of around three to six years for commercial systems. Treat that as a rough guide, since your own payback depends on your power prices, how much solar you use on site and what the project costs.
How Is This Different From the Old LGC Pathway?
Before 1 October, a system above 100 kW could be accredited as a power station and earn LGCs. LGCs are paid as your system actually generates electricity, so money comes in slowly, and the value depends on the market.
STCs are paid up front. That changes the cash flow, because a big slice of the benefit arrives when the system is installed. As Haron Robson explains, production and certificate-price risk are largely settled early.
One rule to remember: a system can't create both STCs and LGCs for the same capacity. Existing LGC power stations stay where they are.
Which Businesses Benefit Most?
The change targets what many in the industry call the "missing middle." These are sites too big to get much from household-sized rebates, and too small to attract big project finance.
Good fits include:
Warehouses and distribution centres with large, flat roofs
Factories and workshops that run during the day
Cold stores and food processors with steady power use
Farms and agricultural sites
Schools, clubs and shopping centres
The best commercial solar systems match your biggest power use to the hours of the day when the sun is shining.
What Do You Need to Claim Commercial Solar STCs?
This is where businesses can trip up. The mid-scale pathway has extra rules on top of the usual ones. Based on the CER's requirements, you'll need:
Panels, inverters and batteries on the Clean Energy Council approved list
Design and installation by a Solar Accreditation Australia (SAA) accredited installer (the CER says an accredited designer isn't required for mid-scale)
An as-built structural engineering report
An electrical single line diagram
A network connection agreement
Evidence that planning and building approvals have been met
Geotagged, time-stamped photos showing the accredited installer on site at the final stage of commissioning
Panel serial numbers
A claim lodged within 12 months of the installation date
The "installation date" is the date the system was first able to produce and deliver electricity. The CER says it's the testing and commissioning date shown on your certificate of electrical compliance. Keep all your records. They matter.
What If You Already Have Solar or Plan to Expand?
Expansions can qualify, but the rules are strict. According to the CER's guidance:
STCs apply only to the new capacity installed from 1 October 2026
The combined system must be above 100 kW and no more than 1 MW
The new and existing parts must be electrically connected as one system
For example, an existing 80 kW system expanded by 40 kW could count as a 120 kW mid-scale system, but only the extra 40 kW earns STCs.
The 1 MW cap also looks at related systems, nearby systems and existing LGC power stations. If you're planning staged projects or several buildings on one site, get advice before you design anything. The CER says metering, network connections and system boundaries all matter.
Also, replacing some panels on an existing system while reusing a previously claimed inverter isn't eligible for new STCs.
What About Batteries and Other Commercial Solar Incentives?
Solar batteries between 5 kWh and 100 kWh can also earn STCs under the scheme, according to the CER. Battery rates change over time, so check current figures before you budget.
A few other commercial solar incentives are worth a look:
Tax treatment. The ATO's $20,000 instant asset write-off applies per asset, so it rarely covers a whole commercial system. Ask your accountant about depreciation and deductions.
State and territory programs. These vary by location, so check with your state energy department.
Renewable electricity certificates. Industry reporting notes that a mid-scale system receiving STCs can't create REGO certificates during its five-year deeming period. If you want REGO, factor that in.
What Should You Do Now?
It's early November 2026. The systems are eligible, but the CER says applications won't open until mid to late November, and some providers say payments won't flow until the portal is live.
Here's a sensible plan:
Check your commissioning date. It must be on or after 1 October 2026.
Ask for an itemised quote. It should show the STC value, the assumptions and who claims the certificates.
Confirm your network approval timeline. Delays here can push back your install.
Collect your paperwork early. Engineer's report, single line diagram, approvals and compliance certificates.
Check your system boundaries. Look at related and adjacent systems before you size up.
Check for recalled products. The CER lists recalled models, which aren't eligible for STCs.
Talk to your accountant. Cash flow and tax can change the real payback.
What Risks Should You Watch For?
No scheme is perfect. Keep an eye on:
Certificate price swings. The value of an STC can move.
The 2030 end date. The SRES runs to the end of 2030.
Paperwork errors. Mismatched dates or missing photos can lead to rejected claims.
Approval delays. Network and planning approvals can take time.
"Subject to" quotes. Make sure any quote clearly states what's included.
Quick Questions
Can I claim STCs on a system commissioned before 1 October 2026?
No. The CER says eligibility depends on the installation date, and the change applies to systems installed on or after 1 October 2026.
Do I need an accredited designer for a mid-scale system?
Not according to the CER. You do still need an SAA accredited installer, and the extra documents.
Does a single meter mean my site counts as one system?
Not necessarily. The CER says one National Metering Identifier doesn't decide it alone. It looks at physical and electrical boundaries, metering and whether systems are related.
Can a 1.2 MW system get STCs?
No. Systems above 1 MW stay in the large-scale scheme.
Do off-grid systems qualify?
They can. The CER says eligible mid-scale systems may be grid-connected or stand-alone, if they meet the requirements.
Do I receive the rebate as cash?
Usually, STCs are assigned to your installer or an agent, who applies the value as a discount. Ask exactly how it will be handled in your quote.
The Bottom Line
The October 2026 change is a big opening for businesses with mid-sized sites. Solar rebates up to 1MW can lower the upfront cost, speed up payback and make larger projects easier to justify. But the details matter: the install date, the paperwork, the system boundaries and the quote.
If you're planning commercial solar systems for your business and want to know what you could claim, contact us at Renewables, and we'll go through your site, your power use and your numbers.